Anzzi SD-AZFL06001 Series Manual de instalação e operação - Página 12

Procurar online ou descarregar pdf Manual de instalação e operação para Luminárias de casa de banho Anzzi SD-AZFL06001 Series. Anzzi SD-AZFL06001 Series 16 páginas. Glass shower door

Step 7
1. Clean the Fixed Panel[OS] with rubbing
alcohol. Install the Wall Jamb Seal[04] to the
Fixed Panel [OS]. The top end of the Wall Jamb
Seal[04] should meet the top of the glass.
The bottom end should leave a gap of 10mm
from the bottom of the glass.
Step 8
1. Install the Bottom Rail Seal[07] to the
Bottom Rail [06]
5
3
Fig 7
Fig 8
10