Duerkopp Adler N291 Manual de instalação - Página 8

Procurar online ou descarregar pdf Manual de instalação para Máquina de costura Duerkopp Adler N291. Duerkopp Adler N291 9 páginas.
Também para Duerkopp Adler N291: Manual de instruções (12 páginas)

Duerkopp Adler N291 Manual de instalação
Fastening the hand-
wheel a. synchronizer
To screw on the handwheel 4 proceed as
follows:
Turn the arm shaft until the timing pin 2
that is slid through the hole 3 in the
housing can be inserted right into the
deepest slot of the disk on the arm shaft.
Screw on the handwheel such that its
mark "A" is level with the timing pin 2.
Screw on the synchronizer 5.
When the synchronizer must be screwed
on again after a repair, it is necessary to
redetermine its reference position (see
point 9). This is however no longer
necessary, when the following measures
are taken:
Insert the pin of the accessories into the
hole of the handwheel.
Bore an 8-mm-deep hole 6 into the
synchronizer 5.
Screw on the synchronizer such that the
pin of the handwheel is in its hole.
Fasten the thread stand.
Screw on the control panel.
7. Connecting the
maintenance unit
Screw the maintenance unit to the stand.
Connect the hose with the maintenance
unit and the machine head.
8. Laying and connecting
the electrical cables
Lay the cables.
Connect the cable plugs that are mostly
marked with symbols with the appropriate
bushings.
8
9. Filling in the oil and
readying the machine
for service
Pour the oil ESSO "SP NK 10" into the
two reservoirs 1 and 7 up to the mark
"MAX".
Pour the oil ESSO "SP NK 10" into the
mist lubricator of the maintenance unit up
to the "groove".
Connect the compressed air hose with
the maintenance unit and the com-
pressed air supply.
Set an operating pressure of 6 bar with
the pressure regulator.
Connect the mains plug with the mains.
Determine the reference position of the
synchronizer.
Proceed as described in the service
manual and the instruction manual of the
motor manufacturer, thereby referring the
reference position to the position D of the
handwheel.
After the reference position has been
determined, the signals "1
nd
"2
position" are correctly timed.
10. Making a sewing test
and checking the
supply of the mist
lubricator
With turned off machine, thread the
needle thread and install the bobbin (see
operation manual).
Make a sewing test with material.
To do this, operate the sewing machine
for some minutes at low speed before
sewing at maximum speed.
Check the supply (approx. 1 drop with 10
work cycles) of the mist lubricator and cor-
rect, if necessary.
st
position" and