Anzzi L-AZ 904 Series Manual de instalação e operação - Página 6

Procurar online ou descarregar pdf Manual de instalação e operação para Produto de canalização Anzzi L-AZ 904 Series. Anzzi L-AZ 904 Series 8 páginas. 2 tone lavatory faucet

INSTALLATION
3
STEP 3:
1.
Turn on hot and cold water supplies and check all connections for leaks where indicated by arrows. Retighten if
necessary, but Do Not Overtighten.
2.
Using the Key [10], remove Aerator [09] from Faucet.
3.
Turn the Handle to full on position and flush water lines for one minute. Reinstall Aerator [09] with the Key
[10].
PUSH POP-UP INSTALLATION
Specification
[09]
[10]
4
STEP 4:
1.
Remove Body and Gasket from POP-UP drain.
2.
Install the Body and Gasket through the drain
hole of the sink as shown in Figure 4.
Handle
Faucet
Body
Gasket
PG.4