Anzzi SB-AZ011WC Manual de instalação e operação - Página 6

Procurar online ou descarregar pdf Manual de instalação e operação para Produto de canalização Anzzi SB-AZ011WC. Anzzi SB-AZ011WC 14 páginas. Shower base
Também para Anzzi SB-AZ011WC: Manual de instalação e cuidados (8 páginas)

Anzzi SB-AZ011WC Manual de instalação e operação
STEP 3
Drill 3/16" holes at all stud locations on top
flanges. (Fig 3)
IMPORTANT: Drill 3/16" clearance holes into
flanges only. Do not drill 3/16" holes directly
into studs. Drill chuck can damage base. Use
an extended bit holder to reduce risk of drill
chuck hitting base.
STEP 4
Install the shower drain (NOT INCLUDED)
according to the drain installation manual
(supplied with the drain). (Fig 4)
ATTENTION
Plumber's putty will degrade base material,
causing cracks and potential property
damage. DO NOT use plumber's putty to
seal between drain and base. Use sealant
or gasket.
Fig. 3
Fig. 4
4