Anzzi SB-AZ013WL Manual de instalação e operação - Página 8
Procurar online ou descarregar pdf Manual de instalação e operação para Produto de canalização Anzzi SB-AZ013WL. Anzzi SB-AZ013WL 14 páginas. Shower base
Também para Anzzi SB-AZ013WL: Manual de instalação e cuidados (8 páginas)
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
●
tray.
Install the Drywall above the tile flanges and secure it to the studs.
●
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
●
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
●
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6