Anzzi SP-AZ8104 Manual de instalação - Página 6
Procurar online ou descarregar pdf Manual de instalação para Produto de canalização Anzzi SP-AZ8104. Anzzi SP-AZ8104 20 páginas.
INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart at approximately 45" below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4