Anzzi FT-AZ114-59 Manual de instalação e operação - Página 6
Procurar online ou descarregar pdf Manual de instalação e operação para Banheiras Anzzi FT-AZ114-59. Anzzi FT-AZ114-59 10 páginas. Freestanding bathtub
SPARE PARTS LIST
VANITY COVERS
Vanity covers have been provided to conceal the faucet'
This step is en�rely op�onal and not required for the opera�on of the unit and it' s faucet.
Note: Make sure to leave ample space between each cover to prevent obstruc�ng, kinking
or damaging the faucet'
TOOLS REQUIRED
LEVELER
RULER
MARKING
PENCIL
NOTE:
THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO TEST THE BATHTUB BEFORE
PERMANENT INSTALLATION. IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE
PERMANENT DRAIN ASSEMBLY.
6
Have questions? Call us at
(this set is completely optional, see page 9)
s hoses.
ADJUSTABLE
WRENCH
CAULK GUN
110-240V
s hoses for a more finished look.
TEFLON
TAPE
CAULK
SCREW DRIVER
or visit us at
Picture
FLEXIBLE
DRAIN
included
ELECTRIC
DRILL
www.ANZZI.com