Danfoss APP 16-22 Instruções de desmontagem e montagem - Página 10
Procurar online ou descarregar pdf Instruções de desmontagem e montagem para Bomba de água Danfoss APP 16-22. Danfoss APP 16-22 18 páginas. Changing pistons
Também para Danfoss APP 16-22: Manual de instruções (8 páginas)
Instruction
10
Disassembling and assembling APP 11-13 and APP 16-22
19.
Place pistons in retainer plate and cylinder
barrel. When pistons are placed, tilt retainer
plate for easier placement of swash plate.
If swash plate has been disassembled from
mounting flange, see page 12 for assembly of
swash plate.
21.
Lubricate piston shoes and swash plate
with clean filtered water.
23.
Place three bolts in mounting flange.
(Remember lubrication as stated in
paragraph 1 page 7.)
Turn each bolt one round at a time to
ensure mounting flange is mounted as
straight downwards as possible.
Be careful not to squeeze the O-ring.
25.
Place pump horizontally to get access to
shaft.
180R9228 / 521B1181 / DKCFN.PI.013.A2.02 / 10.2013
20.
Place the guide pin in the housing.
22.
Mount assembled swash plate, using the
guide pin.
24.
Screw in the rest of the bolts and tighten all
screws to a torque of 30 +/- 2 Nm.
26.
Lubricate shaft with clean filtered water.