Dunster House SENSOVDOOM DHCBSHED2414 Manual de instalação - Página 13

Procurar online ou descarregar pdf Manual de instalação para Casas de jardim Dunster House SENSOVDOOM DHCBSHED2414. Dunster House SENSOVDOOM DHCBSHED2414 14 páginas.

HASP & STAPLE, TURN BUTTONS
a)
Position the hasp, staple and turn buttons to correct position as shown in the diagram (right hand)
b)
Fix the hasp, staple and turn buttons into the frame by using 35mm screws.
Hasp & staple Installation
Staple
S35
FELT
a)
Cover the entire roof with plastic membrane and staple underneath the roof board.
b)
Place the Felt layer 1 on the rear side onto the roof boards and ensure there is an
80mm overhang on the sides and a 140mm overhang on the rear.
Secure onto the eaves with 10mm clout nails approximately 70mm apart. Do this all
around the first layer of felt as shown below.
c)
Position the Felt layer 2 so it overlaps the felt layer 1 by approximately 200mm.
Secure the felt layer 2 with 10mm clout nails 20mm from the edge of the felt and
70mm spacing between the clout nails.
Felt Layer 1
Assembly Steps
Pre-drill parts before fixing with screws
Principles of Installation
Front view with fixings
S35
Hasp
Turn button Installation
TB50
Principle of felt overlap (1.0)
Felt
10mm COUT NAIL
(Distance between
nails approx. 70mm)
Felt Layer 2
Page 13