Dunster House H3-GS4X35HEX Manual de instalação - Página 14

Procurar online ou descarregar pdf Manual de instalação para Abrigos Dunster House H3-GS4X35HEX. Dunster House H3-GS4X35HEX 17 páginas. Hexagonal utopia garden shelter

Felt
Plastic Waterproof Membrane:
Place membrane over top of roof leaving a 15-20mm overhang on each side. If membrane does not overlap whole area of
roof face overlap a second piece with at least a 20mm overlap. Secure membrane to roof boards using a staple gun.
Felt:
Starting at the lowest edge of the roof, lay the felt horizontally across the roof boards.
Make sure that the lowest edge of the felt overhangs the eaves edge of the roof by approximately 40-50mm, and by
approximately 50mm on the front and back edges.
Nail at approximately 200mm intervals.
Overlap by 200mm if you need to connect two rows of felt.
Continue laying the next layers of felt and nail into the roof boards at 200mm intervals horizontally and with 300mm
intervals vertically.
Overlap the layers by 200mm and we recommend you seal any joints using the optional felt lap adhesive.
Repeat this process on the opposite side of the roof.
20mm Clout Nails
Cut felt at
an angle.
Second layer
Cut out of felt
15-20mm Overhang
Membrane
Roof Mambrane
200mm Overlap
page 1