DuraTrel Oxford Instruções de montagem - Página 3

Procurar online ou descarregar pdf Instruções de montagem para Equipamento para relva e jardim DuraTrel Oxford. DuraTrel Oxford 4 páginas. Trellis

Starting at the bottom of 59½" left post (part 2) insert one 20" top/bottom cross rail (part 4) and six 19¼"
horizontal slats (part 7). Starting at top, weave one 49" vertical slat (part 6) above and below horizontal slats,
inserting end into bottom cross rail. Weave a second 49" vertical slat (part 6) above and below horizontal
slat opposite previous slat, inserting end into bottom cross rail. Insert one 20" top/bottom cross rail (part 4)
and one 19" bent top (part 5) into holes at top of post, inserting free ends of vertical slats into top cross rail.
REPEAT using remaining 20" top/bottom cross rail (part 4), 49" vertical slats (part 6), 19¼" horizontal slats
(part 7), 19" bent top (part 5) and 59½" right post (part 2) to make right side.
Oxford Trellis
3