Duratuf KL1 Manual de instruções de montagem - Página 8

Procurar online ou descarregar pdf Manual de instruções de montagem para Armazenamento ao ar livre Duratuf KL1. Duratuf KL1 16 páginas. Kiwi series

Duratuf KL1 Manual de instruções de montagem
LOUVRE WINDOW
Step 1: Lay out the two window studs (883mm) and
Nog (634mm) on a flat surface. Position
Nog and nail in place using 2x 75mm nails
at each end.
Step 3: Nail wall Sheets to window framing using
30mm clouts. (return to step 4 on page 7
and complete). Then fit Window Frame).
Position Window Frame centrally on win-
dow opening and rivet it to ribs. Pre-drill
holes in each corner and nail Window
Frame to framing, using 50mm nails.
FIXED WINDOW
Step 1: Lay out the two window studs (883mm) and
Nog (590mm) on a flat surface. Position
Nog and nail in place using two 75mm nails
at each end.
KL3 WINDOW (Optional)
588mm
50mm
NAILS
RIVITS
570mm
Step 2: On the inside of the shed, position studs
and Nog centrally on window opening.
Make sure the studs are parallel and nail
into Top Plate and End Wall Nog.
Step 6: From the inside of the shed, slide Louvre
Glass into Louvre Units attached to the
Window Frame. Bend up tabs to keep
Glass in position.
Step 6: From the outside of the shed, place glass
in Window Frame. Attach a Glazing Bead
(G100) with three rivets to each side of the
Window Frame to hold glass in place. Pre-
drilling Glazing Beads is recommended.
8