Duratuf KIWI MK2A Manual de instruções de montagem - Página 5

Procurar online ou descarregar pdf Manual de instruções de montagem para Armazenamento ao ar livre Duratuf KIWI MK2A. Duratuf KIWI MK2A 16 páginas.
Também para Duratuf KIWI MK2A: Manual de instruções de montagem (18 páginas)

Duratuf KIWI MK2A Manual de instruções de montagem
Note:
If fitting a window, there will be no centre stud on the window side. Instead nail in a full length Nog (2.455)
using window studs (.883) to get correct height. Position one window stud centrally beneath the Nog and nail
in place. Further window studs and Nogs are fitted after the cladding is on.
Step 1: Back Wall: Select one 2.545m Base Plate
(Green), one 2.545m Top Plate (Red) and three
Studs (Yellow). Lay out Plates and two Studs on
a flat surface and nail together using two 75mm
nails per join. Nail in remaining centre stud using
1.205m Nogs to get correct position. Position
Nogs .883m from Top Plate and nail in place.
Step 2: Front Wall: Select one 2.545m Base Plate
(Green), one 2.545m Top Plate (Red), four
Studs (Yellow) and two .785m Nogs. Nail studs
to each end of Plates. Nail in remaining two
studs using .785m Nogs to get correct position.
Position Nogs .883m from Top Plate and nail in
place.
Step 3: Select two 2.545m Base Plates (Green) and two
2.545m Top Plates (Red). With front wall lying on
the ground, nail Plates to frame. Ensure Green
joins to Green and Red joins to Red.
Step 4: Position the back wall frame on top of plates.
While someone supports frame, nail in place.
Nail in centre Stud using 1.205m End Wall Nogs
to get correct position.
Step 5: Carefully roll frame over onto its base. (Pieces of
timber from the packaging may be used to tem-
porarily brace the frame before rolling it over).
Position 1.205m End Wall Nogs .883m from Top
Plate and nail in place. If fitting a Kiwi Floor, fit
Floor Joists now. Space joists equally and nail in
place using three 75mm nails per end.
Step 6: Position a Jack Stud on each end of Ridge
Beam and nail in place using two 75mm nails
each end (fig. 1). Turnover Ridge Beam / Jack
Studs, position centrally on 2.545m Top Plates
and nail to Top Plates using two 75mm nails
per Jack Stud.
MK2A TIMBER FRAME
1
2
3
4
5
6
5