475 e2 Manual de instruções de instalação - Página 6

Procurar online ou descarregar pdf Manual de instruções de instalação para Ventilador 475 e2. 475 e2 7 páginas. With 5/uni-fr

ASSEMBLY– VENTILATION INSERT AND INDOOR ROOM COVER
Remove interior protection lid cover, insert heat
exchange unit into the installation pipe, ensure there is
a ⅞" gap on interior of pipe. Motor/fan faces interior.
The loop on fan unit can be used to pull unit for
maintenance.
Connect wiring to plug. Connect plug into socket and
set them into the recess of the heat exchanger casing.
Insert interior cover with filter casing, snap the interior
blind into place in open position (¼" off wall).
If cover completed covered, lift cover and rotate 180°.
Installation is now complete.
OPERATION
When operating the Lunos e
switch, apply the provided sticker to the switch plate
as shown. The markings on the sticker correspond to
the following:
Both W1 + W2 OFF
Switch W1 ON
Switch W2 ON
Both W1 + W2 ON
Sticker placement
2
using a double-rocker
= Level 0
= Level I
= Level II
= Level III
W1
W2
Questions? Email: [email protected] | Call: 800-995-6329
When operating the Lunos e
Rotary Switch, the switch positions correspond to
the following (assume a clock face):
12:00 (position 0)
1:00 (position 1)
2:00 (position 2)
3:00 (position 3)
2
with the optional 475
= Level 0
= Level I
= Level II
= Level III
6