Appareo GW03 Manual de instalação - Página 6

Procurar online ou descarregar pdf Manual de instalação para Porta de entrada Appareo GW03. Appareo GW03 9 páginas.

3.2. INSTALLATION INSTRUCTIONS OVERVIEW

System installation is accomplished in the following steps:
1) Installation of Gateway into the tractor cab headliner
a. Torque the antenna terminations to Gateway RF SMA connectors with a torque
spec of 7-10 in-lbs +/- 0.5 in-lbs. Mount the Gateway enclosure to the cab with ¼"
or 6-mm fasteners and a torque of 30 in-lbs.
2) Installation of Antennas
a. Find a location on the equipment such that the following distances are the
minimum spacing between system components.

Table 1 System Component Minimum Spacing

Antenna Hub 1
(Recommended minimum
spacing between antenna
hubs is 7.5 cm)
Antenna Hub 2
Gateway
b. Ensure the antennas have a ground place of 300 x 300 mm around them.
c. Torque the antenna mounting nut (M14x1) to 30 +/- 0.5 in-lbs.

3.3. PARTS LIST FOR INSTALLATION

The following parts are required for the installation of Gateway.

Table 2 Parts List for Installation

Item
1
Gateway
2
Antenna Hub 1
3
Antenna Hub 2
Document Number: 600840-000038
Operator
40 cm (USA)
60 cm (Canada)
40 cm (USA)
60 cm (Canada)
20 cm
Parts List for Installation
Nomenclature
Installation Manual
Last Revised: 3/22/16
Gateway
20 cm
20 cm
N/A
Part Number
153510-000003
NA
NA
Rev: 1.2
QTY
1
1
1
Page 6 of 9