Datalogic CBX500 Manual de instalação - Página 8

Procurar online ou descarregar pdf Manual de instalação para Leitor de código de barras Datalogic CBX500. Datalogic CBX500 16 páginas. Scanning connection box
Também para Datalogic CBX500: Manual de instalação (17 páginas), Manual de instalação (17 páginas)

Datalogic CBX500 Manual de instalação
CBX500 INSTALLATION MANUAL

SYSTEM WIRING

The connection and wiring procedure for CBX500 is described as follows:
1) Open the CBX500 by unscrewing the four cover screws.
2) Verify that the CBX500 power switch is off (see Figure 3).
3) Unscrew the compression connectors and pass all the system cables through them into the CBX500 housing.
4) To connect the power and input/output signals:
• Prepare the individual wires of the system cables by stripping the insulation back approximately 1 cm.
• Using a device such as a screwdriver, push down on the lever directly next to the clamp (see Figure 5).
• Insert the wire into the clamp and release the lever.
The wire will now be held in the spring clamp.
5) Tighten the compression connector nuts so that the internal glands seal around the cables.
Flexible stranded wire should be used and must meet the following specifications.
All positions:
24 - 16 AWG
The CBX500 spring clamp connector pinouts are indicated in the Pinout table.
Refer to the reading device Installation Manual for signal details.
8
Figure 5 - System Cable Connections
0.2 - 1.5 mm²