DV8 OFFROAD SPBR-05 Manual de instalação - Página 3

Procurar online ou descarregar pdf Manual de instalação para Acessórios para automóveis DV8 OFFROAD SPBR-05. DV8 OFFROAD SPBR-05 12 páginas. Trailing arm skid plate

INSTALLATION
MANUAL
STEP 2 |
Place the floorjack under gas
tank and raise it so they are supporting
the gas tank.
We used two floorjacks for increased
stability,
If using only one floorjack for support,
center it under gastank parallel with bolt
directly in front of frame side control arm
mount.
STEP 3 |
Use an 18mm socket to
remove the (3) bolts along the passenger
frame rail, and the (2) bolts securing the
skid to the front cross member.
STEP 4 |
Use an 18mm socket to
remove the bolt securing the gas tank
under the rear driveshaft.
skid located
Set all hardware off to the side for re-
installation.
855-680-9595
NEED HELP?