Gage Bilt GB713 Manual de instruções original - Página 6

Procurar online ou descarregar pdf Manual de instruções original para Ferramentas Gage Bilt GB713. Gage Bilt GB713 18 páginas.
Também para Gage Bilt GB713: Manual de instalação (14 páginas), Manual de instruções original (20 páginas)

Gage Bilt GB713 Manual de instruções original
When the air actuator assy is depressed, the pressurized air inside of the tool is released allowing spring pressure to move the valve
spool assy causing the air to be redirected. The air is directed to the top of the air piston assy, moving it in a downward direction.
The air below the air piston assy is then directed through the valve sleeve and exhausted out of the bottom of the tool.
Simultaneously, the piston rod assy, connected to the air piston assy, is also moving down, forcing hydraulic oil up and into the
front side of the head cylinder assy, causing the piston to move to the rear of the head cylinder assy. The internal components of the
attached nose assembly are also moving with the piston to start the fastener installation. When the fastener installation is
completed, the air actuator assy is released. Air pressure is then built up inside of the handle assy causing the valve spool assy to
return to its original position and reversing the sequence directing air pressure to the rear of the head cylinder assy, causing the
piston to move to the forward position.
PULL Cycle
Piston Rod Assy
moves down
Air Piston
moves down
GB713

PRINCIPLE OF OPERATION

Piston Rod Assy
moves up
Air Piston
moves up
Air exhaust
Pressurized Oil
Pressurized Air
Return Oil
Exhaust Air
Image may not reflect actual tool
6
RETURN Cycle
Air exhaust
7/11 REV 6/16