HI MART NHC-609 Manual

Procurar online ou descarregar pdf Manual para Mobiliário de interior HI MART NHC-609. HI MART NHC-609 2 páginas. 4 bars & 2 shelves 1 pants (32mm)

Making the Pillar Stand
upper pillar
Spring operation
makes it go up
about 2~3cm higher.
Set up the pillar lean-
ing upper pillars to-
ward the wall a little.
Fasten the safety
bolt(
) with hands.
Set up the pillar after
lower pillar
inserting lower pillar
in the below fixation
board.
Explanation on pictures
Move pillars to the setting place. Hold lower pillar and
upper pillar, one pillar with one hand, pull the pillar toward
the ceiling and fix it on the ceiling and bottom accurately.
The pillar is fixed strong due to the spring operation of the
upper fixation board (attach it on the ceiling by pulling
about 2~3cm with possible power)
After setup the pillar, fasten the safety bolt with hands at
one touch fixation device for use safety.
Notice If you do not tight upper pillar, it may fall.
Please strengthen the power given to the top of pillar.
Pillar and Component Setting
Product Size : 217cm (width), 170~253cm (height), 32cm (depth)
Basket shelves
Safey bolt
Basket shelves
holder
Hanger
horizontal bar
Pants hanger
one touch
fixation device
Pants
hanger bar
Pants hanger
bar holder
Basket shelves
approx 75cm
approx 75cm
Pillar 1
Pillar 2
Pillar 3
Pants hanger bar
►Please push down
Pants hanger bar holder
►Arrange pillars at the same space in making pillars stand.
►After leveling respective holders, set up parts as shown in
picture.
►After regulation open holder to the wanted height with
rubber ring, fasten safety bolt at the back.
Products have different colours but setting method is same.
Hanger
horizontal bar
Open circle
holder
Open circle
holder
Basket shelves
holder
approx 75cm
Pillar 4
4 Bars & 2 Shelves 1 Pants (32mm)
the Pants hanger
bar into the Pants
hanger bar holder.
3C/89 Ellice Rd. Glenfield, North Shore
Shop 2, 2 Bishop Dunn Pl. Flat Bush
Since 1999
NHC-609
www.himart.co.nz
Ph) 4449114, 9486440