Gage Bilt GB54B Manual de instruções original - Página 7
Procurar online ou descarregar pdf Manual de instruções original para Ferramenta eléctrica Gage Bilt GB54B. Gage Bilt GB54B 16 páginas. Pneumatic installation tool
Também para Gage Bilt GB54B: Manual do utilizador (9 páginas)
When the actuator assembly (1) (510127) is depressed, the pressurized air inside the tool is directed to the front side of the piston
(3) (510101) thus moving it to the rear of the cylinder assembly (2) (500119), forcing the air from the back side of the piston (3)
(510101) to be exhausted from the standard exhaust port on side of tool (see page 5). The internal components of the attached nose
assembly are simultaneously moving with the piston (3) (510101) to start the fastener installation. When complete, the actuator
assembly (1) (510127) is released directing the air to the back side of the piston (3) (510101) reversing the sequence.
3
2
1
Piston in forward position
Air is exhausted through the standard exhaust port on the side of the tool. To redirect air exhaust to rear of tool, remove plug (401816)
from rear exhaust hole. If changing exhaust back to side, we recommend applying Vibra-tite® to plug (401816) before installation.
STANDARD
EXHAUST
(Side of tool)
OPTIONAL
EXHAUST
(Rear of tool)
GB54B S/N: 1088 AND ABOVE
PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
PRINCIPLE OF OPERATION
3
2
1
AIR EXHAUST
Air is exhausted through
Standard Exhaust Port
on side of tool.
Air is exhausted through
Rear Exhaust Port
Images may not reflect actual tool
7
Piston in rear position
Rear Exhaust Port
Plugged
Rear Exhaust Port Plug
removed. Side port plugged.
Rev. 10/22