Dyna-Glo Pro LPFA43H Manual do utilizador e instruções de funcionamento - Página 6
Procurar online ou descarregar pdf Manual do utilizador e instruções de funcionamento para Aquecedor Dyna-Glo Pro LPFA43H. Dyna-Glo Pro LPFA43H 16 páginas. Propane construction heater
1. Remove heater from carton.
2. Remove all protective packing applied to heater for shipment.
3. Retain cartons and packaging material until unit is operated and found in good condition.
4. Check heater for any shipping damage. If heater shows any external or internal
damage, promptly inform dealer/distributor where you purchased heater.
Assembly Components and Instructions for Steel Base Units:
Tools required for assembly:
All Models: Adjustable Wrench
Regulator and Hose Connection:
See figure on right.
Connect the hose tightly to
the heater using a wrench.
Please also refer to
page 7 in the manual.
5
PROPANE CONSTRUCTION HEATER
UNPACKING HEATER
Contents:
All Models: Unit, Manual, Hose and Regulator
Assembly
Tighten, clockwise,
use a wrench
Assembly Time:
5 Minutes
Hose Assembly
NEVER LEAVE THE HEATER
UNATTENDED WHILE BURNING!