Great Little Trading Marshmallow Kitchen Montagem - Página 5
Procurar online ou descarregar pdf Montagem para Mobiliário de interior Great Little Trading Marshmallow Kitchen. Great Little Trading Marshmallow Kitchen 6 páginas.
Hardware for Step 5:
8x #1 25 mmL screws
STEP 5:
Position both oven door (N) and washing machine door (P) then secure both the
cooker panel (M) and washing machine panel (O) using 8 x screws (#1).
STEP 6:
Position dishwasher door (Q) into place.
M
O
N
P
Q
Hardware for Step 7:
5x #1 25 mmL screws
R
STEP 7:
Attach left and right top side panels (R) and (S) to
the worktop (Z) using 4 x screws (#1).
Then attach tap (a) using 1 x screws (#1).
Hardware for Step 8:
4x #1 25 mmL screws
STEP 8:
Attach microwave sides (T) and (U) to the shelf panel (Y).
Ensure the magnet on panel U faces forwards.
5
S
Z
Y
T
U
a