AFFIX MADW 320-AGR Manual de montagem - Página 17

Procurar online ou descarregar pdf Manual de montagem para Ambiente de trabalho AFFIX MADW 320-AGR. AFFIX MADW 320-AGR 20 páginas. Aluminium double width mobile towers

AFFIX MADW 320-AGR Manual de montagem
STABILIZERS
To move the tower to a new position, first prepare the
tower.
Check that the wind speed does not exceed 17 mph.
Ensure the tower is empty (material and personnel).
Check the overhead obstructions including electrical cables.
Raise the stabilizer feet (only enough to clear obstructions, maximum 25mm).
Taking care to ensure tower stability is maintained, release the castor brakes.
Carefully move the tower by manually applying force at the base. Do Not Use mechanical
means to move the tower.
Once positioned, prepare the tower for use.
Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with
the ground.
Check that the tower is vertical.
Reapply the castor brakes.
Certified and independently tested for use.
Compliant to AGR Assembly process.
Safe working load on the platform is 250kgs/Sq Mtr, evenly distributed.
Maximum permissible distributed load on the tower 750 Kgs.
The scaffold towers referred to herein have been tested by
16