AFFIX MADW 420-AGR Manual de montagem - Página 7

Procurar online ou descarregar pdf Manual de montagem para Ambiente de trabalho AFFIX MADW 420-AGR. AFFIX MADW 420-AGR 20 páginas. Aluminium double width mobile towers

AFFIX MADW 420-AGR Manual de montagem
ASSEMBLY
06

FIRST LEVEL

Step 1
Insert the Castor Wheels with the jack
pipe inside the bottom of the tubes of
the 1st level 2 Rung Ladder Frame and
2 Rung Span Frame.
DO NOT USE Hammer.
DO NOT USE Hammer.
Step 2
Step 2.1
Step 2.1
Hook both the bottom 2 Horizontal Braces
horizontally to the Span frame and the
Ladder Frame's vertical pipes, just above
the 1st rung.
Step 2.2
Step 2.2
Lock all the four wheels by pressing the
lock gear with foot.
Step 2.3
Step 2.3
One person should hold the frame in
upright position during this step.