GREAT PLAINS Turbo Max 2400TM Manual de montagem - Página 6

Procurar online ou descarregar pdf Manual de montagem para Semeadores GREAT PLAINS Turbo Max 2400TM. GREAT PLAINS Turbo Max 2400TM 8 páginas.

Step #3
62312-ASEMBLY
(8/16/21)
Connect the s-hook as shown and clinch s-hook so it cannot come off.
Connect s-hook to sash chain and clinch end to s-hook. Connect key ring to spring on run\hold switch.
Note: Chain may have to be shortened to meet desired length needed. Make sure implement can float and that there
is no tension on spring when lowered so Run/Hold switch is not starting and stopping the electric motor when
traveling.
Route wire (62253-5) from Run/Hold Switch along frame to front corner of hopper and connect
wire adaptor (62253-6) to end of wire (62253-5). Connector wire adaptor to white plug (electric motor) in front
corner of hopper.
The Run/Hold switch is wired from the factory to be nominally closed.
The chain has to be pulled to release the switch to stop the electric motor.
Note: The Run/Hold switch only turns on or off the electric motor.
For stopping for long periods of time shut-off the center master switch to cut all power to motor and clutches.
Page 4 of 4