Automationdirect.com Productivity 2000 P2-08AD-2 Manual - Página 5

Procurar online ou descarregar pdf Manual para Sistemas de E/S Automationdirect.com Productivity 2000 P2-08AD-2. Automationdirect.com Productivity 2000 P2-08AD-2 8 páginas. Analog input

Automationdirect.com Productivity 2000 P2-08AD-2 Manual

Wiring Options

1
ZIPLink Connection System
Cable + ZIPLink Module = Complete System
ZIPLink pre-wired
terminal block cables
ZIPLink Modules
2
Terminal Block with pigtail cable
3
Screw Terminal Block only
4
Spring Clamp Terminal Block only
Sales 800-633-0405
0.5m (1.6FT) cable
ZL-P2-CBL18
1.0m (3.3FT) cable
ZL-P2-CBL18-1
2.0m (6.6FT) cable
ZL-P2-CBL18-2
ZL-RTB20
Feed through
1.0m (3.3FT) cable
ZL-P2-CBL18-1P
2.0m (6.6FT) cable
ZL-P2-CBL18-2P
P2-RTB
(Quantity 1)
P2-RTB-1
(Quantity 1)

Module Configuration

Using the Hardware Configuration tool in the
Productivity Suite programming software, drag
and drop the P2-08AD-2 module into the base
configuration.
Select Automatic Module Verification or No
Verification and Enable Hot Swap. If desired,
assign a User Tagname to each input point
(channel) selected and to each Status Bit Item.
8
www.productivity2000.com
5