Gaius Duo 17782 Manual de instruções de instalação - Página 5

Procurar online ou descarregar pdf Manual de instruções de instalação para Casas de banho Gaius Duo 17782. Gaius Duo 17782 12 páginas.
Também para Gaius Duo 17782: Manual de instruções de instalação (10 páginas)

Gaius Duo 17782 Manual de instruções de instalação
Structure
The product has undergone static load testing at 500 kg. The size of the wall mounting fixtures is
700x1150 mm. The fixtures must be affixed to solid structures. The fixtures must be mounted in
accordance with the measurements specified in the diagram.
Electrics
The electrical junction box must be positioned to the right of the mid-line, as shown in the draw-
ing. IP44 or higer junction box (not included)
The base comes with a 230V AC 10A socket.
A residual-current device is recommended for the 230 V AC power supply.
A qualified electrician must perform the connection.
HVAC
The water connection must be positioned to the left of the mid-line, as shown in the drawing.
1. Mid-line
2. Wall
3. Electrical connection
4. Water connection. Water supply with a shut-off valve equipped with a G1/2"external thread.
Thread downwards
5. Wall mounting fixtures
6. Finished floor
7. Wastewater connection on the wall or on the floor (Ø110 mm). The pipe is cut at the level of the
wall.
8. Reinforce area, plywood 36mm or over, solid wood 45mm or over.
7
17783
0 110 mm
76 mm
Note the dimensions!
2
2
5
7
17782
0 110 mm
= 0 mm!
The electrical and water connection must not extend from the
wall by more than 50 mm. NOTE! Exceeding the maximum
depth of 50 mm prevents the toilet seat's downward move-
ment!
700
1
110
110
4
3
8
6
5