Celexon Professional Plus Manual de Instruções - Página 6
Procurar online ou descarregar pdf Manual de Instruções para Quadro branco Celexon Professional Plus. Celexon Professional Plus 8 páginas. Screen
Também para Celexon Professional Plus: Manual de instalação (13 páginas), Manual do utilizador (8 páginas), Manual de Instruções (6 páginas), Manual de Instruções (11 páginas)
Pre-drill the holes at the markings
with the right diameter drill bit for the
ring eyelets and mounting material, fi x
them to the ceiling (according to the
instructions from the manufacturer and
the load of the screen) and hang the
screen from them.
MOUNTING ON THE CEILING (SCREWED)
Measure the distance between the ho-
les in the side caps (two per cap) and
transfer them to the ceiling. Drill the
holes at the markings with the right
diameter drillbit for the diameter of the
mounting material, insert and screw
the screen in place tightly. Make sure
that the holes are parallel to the wall!
Use dowels and screws suitable for
your mounting surface.
Caution:
Do
not
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
overtighten
the
5