Celexon Professional Plus Manual de Instruções - Página 5
Procurar online ou descarregar pdf Manual de Instruções para Quadro branco Celexon Professional Plus. Celexon Professional Plus 11 páginas. Screen
Também para Celexon Professional Plus: Manual de instalação (13 páginas), Manual do utilizador (8 páginas), Manual de Instruções (6 páginas), Manual de Instruções (8 páginas)
IN THE BOX
1x Screen
INSTALLATION NOTES
Install the screen in a position that is fully visible to all viewers! The optimum
installation height corresponds to the position of the viewers in the centre of
the screen with the screen fabric extended: eye level = lower third of the screen
surface.
The screen can be installed on the wall/ceiling or hung from the ceiling on
closed ring eyelets plus screwable karabiners (not included). The eyelets are
already on the side cap - for screwed wall or ceiling mounting only, the eyelets
must be removed beforehand. Please ensure that the metal plates are also
used for wall and ceiling mounting as otherwise a safe installation cannot be
guaranteed. The enclosed mounting material is intended for a solid stone wall,
if necessary obtain suitable mounting material for your installation surface.
MOUNTING ON THE CEILING (VIA EYELETS)
Measure the distance between the
eyelets.
Mark
the
ceiling and make sure that the eyelets
are aligned with each other and parallel
to the wall.
4x Plastic dowels
points
on
the
4x Screws
1x IR remote control incl.
Batteries
4