Aire ChargAIRE Manual - Página 3

Procurar online ou descarregar pdf Manual para Desporto & Ar livre Aire ChargAIRE. Aire ChargAIRE 5 páginas.

Set Up - Step 4 - Scotty® Rod Holder (Optional / Not included):
Items Needed:
1   -­‐   A pproach   S UP   b oard  
1   -­‐   4   -­‐   S co5y   F rameless   M ount   P ads   ( Sco5y   p art   #   3 41   G lue-­‐on   M ount   P ad)  
1   -­‐   4   -­‐   B ait   C ast   o r   F ly   R od   H olders
1. Start   w ith   t he   b oard   d eflated.  
2. Insert   t he   t he   s co5y   f rameless   m ount   p ad   i nto   t he   I GSystem.     T his   i s  
designed   t o   b e   a   L ght   fi t.  
3. Screw   d eck   m ount   o nto   t he   f rameless   m ount.  
4. Insert   r od   h older   i nto   t he   d eck   m ount  
IGSystem for attaching gear, Scotty® rod
holders, anchor lock and camera mounts.
Roll to fit back into bag:
1. The   A pproach   i s   d esign   t o   t ake   a   l i5le   w ater   i nto   t he   fl oor   p ocket   f or  
extra   s tability.     W hen   d one   fi shing,   a llow   t he   e xtra   w ater   t o   d rain.  
2. Release   t he   fi ns.  
3. Deflate   b oard.  
4. Make   t he   fi rst   f old   r ight   a t   t he   e dge   o f   t he   fi n   b ases.  
5. Make   a   c rease   i n-­‐between   t he   b ack   fi n   b ase   a nd   t he   f ront   t wo   fi n  
bases   a nd   F OLD   T HE   B ASES   O NTO   T HE   P VC.     F olding   t his   w ay   w ill  
protect   t he   d eck   p ad   f rom   d amage   t hat   c ould   b e   c aused   b y   t he   fi n  
bases.      
6. ConLnue   r olling.  
7. Place   i n   b ag.
www.aire.com
~ 800-247-3432