YARWAY COLOR-PORT
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
5.2.1.7 Close the upper isolation valve and
open upper Welbloc
completely. Close lower Welbloc
gauge valve; then, slowly open the
drain valve. This will clear the tie-bar
and the gauge with boiler feed-water.
Slowly close the drain valve.
5.2.1.8 Open the upper isolation valve
completely. Re-open the drain valve
slowly until a substantial flow rate
is established through the gauge.
This will purge the upper gauge
connecting lines and the gauge with
a mixture of steam and feedwater.
Slowly close drain valves.
5.2.1.9 Open the upper and lower Welbloc
gauge valves and upper and lower
isolation valves. Check the gauge
for cleanliness. Repeat procedure if
necessary.
Completion of steps 6, 7, and 8, in order, give
progressively increased cleaning action. The
procedure may be stopped after step 6 or 7
by skipping to step 9 once the gauge is clean.
5.2.2
Gauges with Stuffing Box (B/S) Gauge
Valves and Isolation Valves (Figure 2B)
5.2.2.1 Open upper and lower isolation
valves if provided.
5.2.2.2 Close upper Stuffing Box (B/S)
Gauge Valve.
5.2.2.3 Open lower Stuffing Box (B/S) Gauge
Valve.
5.2.2.4 Slowly open drain valve(s). Water
level in gauge will lower as flow rate
through lower Stuffing Box (B/S)
Gauge Valve and connecting pipes
increases. This will clear sediment
from lower Stuffing Box (B/S) Gauge
Valve and connecting lines.
5.2.2.5 Close the drain valve. Water level in
gauge will again rise to top of gauge.
5.2.2.6 Close the lower Stuffing Box (B/S)
Gauge Valve and open the upper
Stuffing Box (B/S) Gauge Valve
completely. Re-open drain valve
slowly until a substantial flow rate is
established through the gauge.
5.2.2.7 Close the drain valve completely.
5.2.2.8 Open the lower Stuffing Box (B/S)
Gauge Valve. Check the gauge for
clearness. Repeat procedure if
necessary. Objects which cannot be
cleared by the above procedure will
require removal of the gauge from
the boiler connections.
WATER LEVEL GAUGES & WELBLOC
®
5.3 How to Service Color-Port
Servicing the Ports
gauge valve
®
Yarway recommends servicing the gauge
®
disconnected from the boiler piping and resting
in a horizontal position on a workbench. Gauges
serviced in this manner, where particular
attention is given to body groove and port
cleanliness, as well as sealing gasket positioning,
have performed better than those gauges
serviced while connected to the boiler piping.
If a gauge must be serviced while still installed
on the boiler, particular attention must be given
to:
1. The cleanliness and integrity of the body
grooves
®
2. The cleanliness and position of the
replacement port assemblies
3. The proper positioning of the sealing
gaskets in the body grooves during
tightening of the cover cap screws.
The following steps must be followed:
(Numbers in parentheses refer to items in
Figure 3B)
1. Isolate the gauge and remove pressure before
starting to disassemble the gauge. Follow
the procedure in section "Preparation for
washdown, servicing gauge auxiliaries or
gauge inspection".
2. Turn off the electrical power to the LED
illuminator. Carefully remove and set aside
the LED illuminator and viewing assembly.
Remove the gauge assembly from the boiler
connection lines.
3. Loosen and remove the cap screws (10). Use
a ⅜" size socket wrench.
4. Remove the viewing port assembly
completely. Figure 3B shows a cross
section. Retain the cover (2), spring cones
(4), washer (5), and retaining spring (8).
Discard the used cushion gasket (6) and the
used glass-mica-gasket-clip ring assembly
(7, 11, 9, and 3).
GAUGE VALVES
®
Water Gauge -
®
4