HighPoint R1120 Manual de instalação rápida - Página 5
Procurar online ou descarregar pdf Manual de instalação rápida para Hardware informático HighPoint R1120. HighPoint R1120 6 páginas. 4x u.2 port to pcie 3.0x16 nvme hba
SFF-8643
Power supply
Step 5: Close the system cover and power up the system.
Note:
Please make sure the cables are securely connected to the
R1120's device ports and the NVMe SSDs or backplane. Loose
connections can lead to a variety of problems including instability,
slower than expected performance and dropped disks.
5