Cora Bike Rack CBLV-LD Manual de instruções de instalação e montagem - Página 3

Procurar online ou descarregar pdf Manual de instruções de instalação e montagem para Mobiliário de interior Cora Bike Rack CBLV-LD. Cora Bike Rack CBLV-LD 7 páginas. Vertical bike locker

Locker Installation & Assembly Instructions
Cora Bike Rack - Vertical Bike Locker (CBLV-LD)
4. Position adjustable foot inside frame before fixing to ground
• After base frame has been levelled by adjusting corner feet, ensure foots final position is located inside
structure of base frame
• Hole on adjustable foot, is to be used for anchor bolt fixing of frame to ground and cannot be located
outside of frame (for security anchor bolts to be inside locker frame structure when installed).
5. Drill holes in ground for location of anchor bolts
• Option 1: Leave base frame in place and drill holes for anchor bolts directly trough hole in adjustable
levelling feet.
• Option 2: Use holes in adjustable levelling feet to mark location of holes for anchor bolts. Mark holes while
base frame is in correct position. Move frame away and drill holes
• Drill or core a hole using a 13mm diameter drill bit to 120mm min. depth
6. Install Anchor bolts, fix base frame to ground
• Locate frame in position with holes in adjustable feet, over drilled holes in ground, knock anchor bolts (x4
one for each corner of frame) into ground through holes in adjustable feet.
• Check level of frame.
• Tighten anchor bolts with standard supplied nut
• After anchor bolt nut is tightened fully, install supplied shear nuts (x4 one per anchor bolt) onto top of
thread
• Tighten shear nuts until head snaps off
Cora Bike Rack - Australia's Bike Parking Experts - WWW.CORA.COM.AU - PH 1800 249 878
inside
frame
outside
frame
anchor bolt
mounting hole
After Anchor bolt install
Rev 2.00 Feb 2020 ©