Galvin Engineering Haws 7777-A Manual de instalação do produto - Página 4
Procurar online ou descarregar pdf Manual de instalação do produto para Produto de canalização Galvin Engineering Haws 7777-A. Galvin Engineering Haws 7777-A 6 páginas. Pedestal floor mtd, axion msr eye/face wash head, s/s bowl, hand & foot act
Também para Galvin Engineering Haws 7777-A: Manual de instalação do produto (7 páginas)
TROUBLESHOOTING
PROBLEM
1. No Flow.
2. Insufficient water flow
3. Eye/face wash streams do not meet
desired eye level.
4. Water does not drain properly.
For more information about GalvinSafe
1.
Check the main shut-off valve.
2. a. Verify minimum 210 kPa flowing
supply line pressure.
b. Probable clogging of flow control due
to inadequate line flushing. Unscrew
eye/face wash head and remove the
four screws to disassemble head.
Clean flow control and reassemble
Head.
c. Remove plug located on L – Strainer
using a 9/16" wrench to access clean
filter screen.
3. Possible blocked flow control, see above
solution. Possible non-leveled eye/face
wash assembly
4. Check the main waste line of your
building to see if it does handle the
capacity required for the entire drainage
system.
®
(Haws) products, see our website.
th
Version 4.1, 13
Aug. 2021, Page 4 of 6
REPAIR CHECKLIST