AGS Merlin 1000SW+ Manual de instalação e operação - Página 10
Procurar online ou descarregar pdf Manual de instalação e operação para Controlador AGS Merlin 1000SW+. AGS Merlin 1000SW+ 16 páginas. Gas, electric & water isolation controller
Também para AGS Merlin 1000SW+: Instalação, operação e manutenção (12 páginas)
Installation & Operation Manual
OPERATION
First Power Up
On connecting mains power, an LED on the front of the panel (AGS Logo) will illuminate red.
1. Turn the key switch to on position.
2. Gas, electric & water will flash for 10 seconds.
3. Press relevant service button to turn required utility on.
Turn the key switch to the off position to turn the panel off.
Note: All services can be turned on or off within 10 seconds only of the key switch being turned
on. After 10 seconds, all utility buttons will be disabled.
The user must turn the key off and back on to adjust any services.
Emergency Shut Off Button
The emergency shut off button is located on the front of the panel.
There is also a facility for remote shut off buttons to be wired in series on the circuit board.
The emergency shut off button(s) will cut off the gas supply and electrics only when activated.
To reinstate the system, the emergency shut off button(s) will need to be reset and the panel
restarted.
LED Indicators
Gas
When the key switch is turned on, the system will
check the installation for gas leaks.
If gas proving is successful, the LED will
illuminate.
ON = Gas On
OFF = Gas Off
Electric
When Electric service is turned on, the Electric
LED will illuminate.
ON = Electric On
FLASHING = Electric Off, Electric button enabled
OFF = Electric Off, Electric button disabled.
Water
When water service is turned on, the Water LED will illuminate.
ON = Water On
FLASHING = Water Off, Water button enabled
OFF = Water Off, Water button disabled.
1000SW+ IOM Rev: 09
01-20
Merlin 1000SW+
10