AGS PARKSAFE GAS DETECTOR Instalação, operação e manutenção - Página 10

Procurar online ou descarregar pdf Instalação, operação e manutenção para Detectores de gás AGS PARKSAFE GAS DETECTOR. AGS PARKSAFE GAS DETECTOR 16 páginas.

Installation, Operation & Maintenance

OPERATION

First Power Up

1.
1. On connecting power, your gas detector Power LED will illuminate.
2. The gas detector then enters a stabilisation phase for approximately 60 seconds – during this time the
Fault LED will flash indicating that the device is not yet ready for operation.
3. The gas detector will then establish a Modbus data signal with the main control panel – during this
time the Fault LED will remain on.
4. When a data signal is established with the main control panel, the Fault LED will switch off and the
detector will be in operation. Check your Parksafe panel for gas detector status.
Do not remove the gas sensor module under power!

LED Indicators

Power
The Power LED will remain illuminated when power to the detector is present.
Fault
An issue with the gas sensing module, i.e. it has been knocked or damaged.
The gas sensing module has reached the end of its expected lifecycle.
Alarm
The system is in alarm condition because dangerous gas levels have been detected.

Gas Alarm Levels

GAS TYPE
Carbon Monoxide (CO)
Nitrogen Dioxide (NO
Rev: 9 10-20
2.
)
2
3.
GOOD
PRE-ALARM
> 25 ppm
25 -100 ppm
< 0.7 ppm
Parksafe Gas Detector
4.
0.7 - 2 ppm
ALARM
> 100 ppm
> 2 ppm
10