Coram Showers CQ95 95 NW Manual de instalação rápida
Procurar online ou descarregar pdf Manual de instalação rápida para Cabinas de duche Coram Showers CQ95 95 NW. Coram Showers CQ95 95 NW 2 páginas.
Please read these instructions carefully and keep for future
reference. Incorrect fitting will invalidate the guarantee.
GENERAL SAFETY & PRODUCT CARE
Take care when handling the parts of the shower pod.
A sharp impact could damage the surface.
Do not over tighten the screws.
The shower pod parts may have sharp edges, we recommend
that gloves are worn when handling.
As the parts are large, we recommend that two people are
needed to carry out parts of the installation.
The pipe work for the shower valve (but not the shower valve
itself) and waste outlet must be fitted prior to installation of
this pod.
Make sure there are no hidden pipes or cables in the walls
where you intend to drill.
Wear safety goggles, appropriate shoes and clothing.
Tie long hair back out of the way.
BEFORE INSTALLATION
Test the base section in its intended position. Check the
trueness of the walls and choose the most suitable position,
taking into account the position of the wall battens. This will
minimise the need for adjustments due to the walls being out
of true.
Putty, mastics or acrylic sealant will damage the surface of
the shower pod. Only use silicone sealant.
1
978
978
mm
mm
Using a spirit level, check if the walls are vertical.
Measure out 978mm from the corner and using a plumb line mark a line
vertically down on BOTH walls.
IMPORTANT: If the walls are not vertical, the measurement should be taken at
the top or bottom as shown (at the narrowest point).
QUADRANT SHOWER POD
CORNER
DIMENSIONS
THE WALLS
CAN HAVE A
MAXIMUM
DEVIATION
FROM
VERTICAL OF
10MM.
2
1500mm
978
ø 8
mm
mm
600mm
978
mm
20mm
Using the short (600mm) and long (1500mm) battens
walls 20mm in from the marked lines. Drill through the battens in three positions into the
wall using a 5mm drill bit. Remove the battens. Using a 8mm masonry drill bit open out
holes in the wall. Insert wall plugs and fix the battens to the wall using 50mm screws.
If the walls are not vertical use the plastic packers provided.
978mm
978mm
(-0/+10mm)
(-0/+10mm)
2350
mm
HOT &
COLD
WATER
INLETS
1500mm
PLASTIC
PACKERS
50
mm
600mm
20mm
, mark their positions on the side
Check contents of the pack before installation.
If there is anything missing, contact our
Customer Care Number for assistance.
CUSTOMER CARELINE: 01746 713410
4
5
25mm
Plastic
Screws
packers
600
mm
22
1500
2/2
mm
50mm
Screws
Battens
12
1
Wall
Shower
plugs
valve
4/4
2
Screw
Speed
cover &
fit barrier
washer
pipe
EQUIPMENT NEEDED:
Drill, 8mm Masonry Bit, 3mm General Bit,
Crosshead Screwdriver, Spirit Level, Plumb Line,
17mm Spanner, Pencil, Tape Measure, Masking
Tape, Silicone Sealant.
3
IMPORTANT
Slide the base unit into the corner so that the front edges are in line with the lines marked
on the walls. The base unit must be level - adjust legs where necessary.
Using a 17mm spanner tighten the nuts UP onto the leg brackets.
00 71205 00 / Issue 3 / 08
MODEL CQ95 95 NW