HIKOB GATEWAY H-GW103A Manual de instalação - Página 11
Procurar online ou descarregar pdf Manual de instalação para Hardware de rede HIKOB GATEWAY H-GW103A. HIKOB GATEWAY H-GW103A 11 páginas.
Também para HIKOB GATEWAY H-GW103A: Manual de instalação (12 páginas), Manual de início rápido (2 páginas)
Installation Guide
INSTALL_GATEWAY-V5
2019/01 Edition
Plug this set up connector to the female Ethernet connector on the back of the GATEWAY.
4.3.2 GATEWAY arm's mounting process
The GATEWAY is delivered ready to be installed. HIKOB highly recommends using RAM
®
MOUNTS
products that can be optionally purchased with your GATEWAY, ask your vendor.
This is a set of 3 elements:
RAP-379U-M616
RAM-2461U
RAM-201U-B
Figure 4 – View of the GATEWAY attached on a pole with RAM mount joints
A first ball joint with a male screw that does the female thread on
any 4 holes of the GATEWAY casing.
A second ball joint, to be mounted on a wall or a pole. It can be
either screwed or attached with plastic clamps, or any method that
suits your environment constraints.
And the double socket arm allowing good adjustment.
Page 11