AFL Hyperscale 2RU Manual de instalação - Página 7

Procurar online ou descarregar pdf Manual de instalação para Ponto de acesso sem fios AFL Hyperscale 2RU. AFL Hyperscale 2RU 16 páginas. Front-access v-panel (fvp)
Também para AFL Hyperscale 2RU: Manual de instalação (17 páginas), Manual de instalação (20 páginas)

AFL Hyperscale 2RU Manual de instalação

Cable Installation

4m/13"
approx.
Slide hose clamps over cable and strip cable
6
jacket 4m according to manufacturer's
guidelines.
Separate out and tape up 144f fiber bundle
8
ends as per splicing schedule and feed into
fiber braid tube.
Series
U-Series 2RU Front-Access V-Panel (FVP)
Braid
Tape
Cut 2.5m/8" approx. length of nylon braid, slide
7
braid onto fiber braid tube, then tape braid at
both ends of tubing to secure.
Slide fiber braid tube up to jacket strip point
9
and remove tape, allowing braid to feed onto
fiber.
© AFL Hyperscale. All rights reserved
Tube
7