Jaga Micro Canal Manual de instruções de instalação - Página 12
Procurar online ou descarregar pdf Manual de instruções de instalação para Sistema de aquecimento Jaga Micro Canal. Jaga Micro Canal 16 páginas.
Também para Jaga Micro Canal: Instruções de montagem (8 páginas), Instruções de montagem (8 páginas)
![Jaga Micro Canal Manual de instruções de instalação](/uploads/products/server2/2027831/2027831.jpg)
9.
INITIAL START
IMPORTANT!
Start-up and Commissioning of the fancoil must be carried out by skilled staff, qualified to work on
this type of product.
DANGER!
Before start-up, make sure the installation has been carried out in compliance with in this manual.
Before start-up the fancoil unit, check if:
1. the unit is positioned correctly
2. the supply and return pipes are properly connected and insulated
3. the pipes are clean and air is removed
4. the inclination of the unit towards the drain and the p-trap are correct
5. the coils are clean
6. the wiring connections are correct and properly tightened
7. the supply voltage is correct
8. the electric power consumption is correct and does not exceed the maximum value indicated in
the catalog
Run the fan for minimal 3 hours and check for abnormalities.
12