Connecting the contacts:
Once the vertical buffer support is fully fixed into position and the cable activation pulleys are in place, the
electrical connections can be made.
The unit has two contacts that must be connected to the
electricity supply following the indications on the diagrams:
Right side: Monitors the active buffer support position.
Left side: Monitors the resting buffer support position.
Check operation:
Once the mechanical assembly and connections are complete, check that the buffer support operates
correctly. This is done by using the cables to activate and deactivate the mechanism from the floor level.
Check that the manoeuvre correctly monitors both positions. Also check that the interlock is properly
adjusted and properly blocked in resting position.
MANUAL FOR INSTALLATION AND USE
DNP16-01. PIVOTING BUFFER SUPPORT