Bristan ZI SHXSMCT Instruções de instalação e manual do utilizador
Procurar online ou descarregar pdf Instruções de instalação e manual do utilizador para Produto de canalização Bristan ZI SHXSMCT. Bristan ZI SHXSMCT 2 páginas.
Specifications
Cold Water Supply
Working Pressures
Min: 0.2 bar
Max: 5.0 bar
3.0
2.0
3.0
2.0
4.0
1.0
1.0
4.0
Min: 5°C Max: 25°C
0.2
5.0
5.0
0.2
Pressure
Pressure
BAR
BAR
Factory pre-set
Maximum Static Pressure: 10.0 bar
38°C
Tools You'll need
Pencil
Flat head Screwdriver
Drill
Cross head Screwdriver
Prior to Installation
All products manufactured and supplied by Bristan are safe to use provided that
they are installed, operated and receive regular maintenance in
accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999 and
current by-laws. For full Installation Requirements & Notes (IRN) please
visit wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease of future
maintenance.
Before installing this product the water supply must be thoroughly flushed in
order to remove any swarf, solder etc.
This product must not be modified in any way as this will invalidate the
guarantee.
Full access must be made available for future maintenance/servicing purposes.
Before drilling into walls, check that there are no hidden electrical wires,
cables or water supply pipes. This can be checked with the aid of an
electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
If in doubt, contact a registered plumber or your Local Water Authority or
the Secretary of the Institute of Plumbing, address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Installation Instructions
& User Guide
Please leave these instructions
with the end user
Product Codes:
ZI SHXSMCT (D8)
Inlet Water Temperature
Inlet Dimensions
Hot Water Supply
65°C
25°C
60°C
5°C
60-65°C Recommended
IMPORTANT
The inlet hot water must
be at least 10°C above the
required blend temperature.
Spanner
Pipe Cutter
Hexagonal Keys
Pack Contents
x1
x1
x2
x2
x2
x1
Installation
1
135-165mm
Centres
Identify the required
positition of the valve and
prepare the water supply pipes.
Mark and drill holes. Secure
Inlet Connections
connectors to pipework using
1/2" BSP female connectors.
(not supplied)
15mm
Compression
3
Socket Spanner
x2
x1
x1
x1
x2
x1
x1
Operation
x1
2
Secure the shrouds into
place.
Insert the filter washers
and secure the shower
Cold
Off
On
to the wall mount.
Temperature
Stop
Hot