GreeenTek Whole House HS 3.0 Manual de instalação, manutenção e funcionamento - Página 6
Procurar online ou descarregar pdf Manual de instalação, manutenção e funcionamento para Filtro de ar GreeenTek Whole House HS 3.0. GreeenTek Whole House HS 3.0 11 páginas.
T ools required
• Phillips #2 or Robertson #1
screwdriver
• 3/32" drill bit
• Tin snips or metal shear
• Power Drill
Location
Return side connections is to be installed
after the last branch on the return air
plenum and minimum 2 linear ft distance
from furnace.
A 5-ft power cord is supplied with the
unit. If not available a 120VAC outlet
needs to be supplied.
Note:
Refer to Section 4 for details on how to
remove the unit's door and filters
Installation
2.4 Installing the unit
Step by step Installation
Steps involved in the preparation of the plenum mount system are
as followed:
Step 1:
Preparing return air plenum
Find a location that satisfies both service and
maintenance requirements and proceed to cut
holes as illustrated below.
Tape template to return air
figure 2.1a -
plenum. Cut opening with metal shears and
predrill for the securing screws.
Remove template.
figure 2.1b -
P AGE 6
GUIDE
Step 2:
Preparing ducting flairs
Remove the door and filters and proceed to
cut the insulation as illustrated below.
Cut the insulation along the inside
figure 2.2a -
edge of both inlet and outlet ports to remove
the insulation from the port openings.
-One cut permits the clean
figure 2.2b
removal of the insulation piece.
-The unit should look like this
figure 2.2c
when the foam piece is remvouved.