ADF LINEA 100 NMV DUO Instruções do suplemento - Página 16
Procurar online ou descarregar pdf Instruções do suplemento para Lareira de interior ADF LINEA 100 NMV DUO. ADF LINEA 100 NMV DUO 17 páginas. Double sided inbuilt heater zero clearance box
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
1/11/19
Step 8:
Fitting the FLue
The flue is raised off the top of the
ZCB and the heater using these 2
brackets, orientated like below.
The bottom of the bracket gets
inserted into the ZCB.
The brackets are fixed to the
10" inner casing and then the
upper folded U shaped hook is
fixed to the 12" outer casing.
These can be fixed with self
tapping screws or rivets.
The 10" slides through the top of the Zero Clearance Box and sits above the
heater resting on the brackets. The 10" MUST be sealed with a flexible sealant
around the top of the Zero Clearance box to stop heater air coming into the
chimney chase cavity.
12" MUST sit 70mm above the ZCB as shown below.
16