Centurion D10 Manual de início rápido - Página 4
Procurar online ou descarregar pdf Manual de início rápido para Abertura de portões Centurion D10. Centurion D10 8 páginas. Industrial sliding gate operators
Também para Centurion D10: Manual de configuração (13 páginas), Manual de instalação (12 páginas), Manual de instalação (12 páginas)
3. Step-by-step installation instructions
400mm
1. Ensure that the foundation plate has
been properly installed. Refer to the
Installation Manual for details.
3. Screw the four M8x40 socket head grub
screws supplied with A10/D10/D10
Turbo into the threaded holes in the
base plate.
200mm
250mm
2. Remove all four captive nuts from the
underside of the gearbox as shown.
These are no longer required, as the
threaded holes in the cage baseplate
serve for height adjustment.
4. Place the base plate over the
foundation plate.
page 3