AFRISO PrimoBox ACB 910 Manual de operação e instalação - Página 16
Procurar online ou descarregar pdf Manual de operação e instalação para Fornecimento de caldeiras AFRISO PrimoBox ACB 910. AFRISO PrimoBox ACB 910 20 páginas. Mixing unit for condensing boilers
Instruction manual
WARNING
16
Do not allow actuators, built-in electrical box and cables
into contact with water.
Connecting the power cable to the device outside the built-in electrical
box is prohibited.
Electrical connections must be made by experienced and qualified
personnel in accordance with this instruction manual.
Fig. 9: Factory distribution of electric wires
the dotted line indicates the recommended routing of the mixed temperature sensor wire (not included)
Cables for connecting the pump and actuator controller to the ACB
electrical box are not included.
The electrical connections should be made according to the diagram
(Fig. 10).
PrimoBox ACB 910 mixing unit for condensing boilers