Bernee BN-5606H3/M3 series Manual do utilizador - Página 8
Procurar online ou descarregar pdf Manual do utilizador para Câmara digital Bernee BN-5606H3/M3 series. Bernee BN-5606H3/M3 series 11 páginas. Integrated speed dome cameras
Step 3: set dome
Set dome bottom DIP switcher (SW1 and SW2) to
confirm control-protocol and dome address, similar
with label setting or switcher setting.
Step 5: install dome
Turn
Insert 3 screw units into the upper bracket hole,
just like the picture directing, confirm all screws are
tightened in locating slot.
WALL MOUNT DOME INSTALLATION
Step 1: install outer shell
Cautions: if it is outdoor installation, should confirm the sealing quality, and avoid approaching heat or moisture. As
variability of bracket type & installation, here only introduce installation method and steps of dome. But for bracket
installation, please refer to related instructions.
Step 2: install dome
Power line
Video line
Control line
a. Set dome bottom DIP switcher (SW1 and SW2) to confirm control-protocol and dome address, similar with label
setting or switcher setting.
b. Connect video cable, power line and control line with mechanical module. Then put and fasten mechanical module
into shell. As picture directing
AC 1
Power supply
GND
24VAC
AC 2
Monitor or other
video-input
devices
Video out
Control signal
RX+
RS-485(Pelco)
RX-
a. Video cable, power line and control line penetrate wall-mount
bracket until stretch out.
b. Then they penetrate outer shell hole until stretch out enough length.
c. As the picture, hang outer shell on bracket, screw-thread is sealed
with waterproof materials.
Step 4: connect to mechanical
module wiring
Power line
Video line
Control line
Connect video cable, power line and control line with
mechanical module. As picture directing.
Turn
- 6 -