HIKVISION DS-2CE79U8T-IT3Z Manual do utilizador - Página 7

Procurar online ou descarregar pdf Manual do utilizador para DVR HIKVISION DS-2CE79U8T-IT3Z. HIKVISION DS-2CE79U8T-IT3Z 16 páginas. Turbo hd 4k series vf bullet & turret & dome camera
Também para HIKVISION DS-2CE79U8T-IT3Z: Manual de início rápido (17 páginas)

HIKVISION DS-2CE79U8T-IT3Z Manual do utilizador
Figure 2-4 Fix the Camera with the Gang Box
5. Attach the junction box's body to the ceiling/wall by
aligning the screw holes of the junction box.
6. Secure the junction box's body with supplied screws
on the ceiling/wall.
Figure 2-5 Fix the Camera to the Ceiling
7. Route the cables through the cable hole, or the side
opening of the junction box.
8. Combine the junction box cover with its body.
Figure 2-6 Fix the Junction Box Cover back to its Body
9. Refer to step 6 of 2.1.1 Ceiling/Wall Mounting
without Junction Box to complete the installation.
2.2 Installation of Type II Camera
2.2.1 Ceiling/Wall Mounting without Junction Box
Steps:
1. Paste the drill template (supplied) to the place
where you want to install the camera.
2. Drill the screw holes according to the drill template
and the cable hole (optional) in the ceiling/wall.
Note:
Drill the cable hole, when adopting the ceiling outlet
to route the cable.
Figure 2-7 Drill Template