Avantco 178UDD60HCS Manual do utilizador - Página 7

Procurar online ou descarregar pdf Manual do utilizador para Utensílios de cozinha Avantco 178UDD60HCS. Avantco 178UDD60HCS 19 páginas. Beer dispensers
Também para Avantco 178UDD60HCS: Manual do utilizador (19 páginas), Manual do utilizador (19 páginas)

Avantco 178UDD60HCS Manual do utilizador
Draft Beer Tower Installation
2
User Manual
Beer Tower
Install Contents
1
3
4
5
6
- 7 -
Installing Draft Tower
1. Connect beer line connector to keg coupler.
2. Place rubber washer over draft arm
mounting holes in cabinet.
3. Put beer line connector down through hole.
4. Secure draft arm with four screws.
5. Insert air hose in draft arm, being careful
not to disturb insulation.
6. Remove top cover of draft arm and attach
air hose clip to the insulating sleeve at the
top of the draft arm. This will assure that the
hose remains in the proper place at all times,
which will keep the beer faucet cold.
7. Replace top cover.
8. Screw the handle onto the beer faucet.
7
8