BERNHARDT design a.k.a. Overhead loop support and tower deck Manual de instruções - Página 2

Procurar online ou descarregar pdf Manual de instruções para Mobiliário de interior BERNHARDT design a.k.a. Overhead loop support and tower deck. BERNHARDT design a.k.a. Overhead loop support and tower deck 20 páginas.

BERNHARDT design a.k.a. Overhead loop support and tower deck Manual de instruções
a
IMPORTANT NOTES
Failure to install product according to installation instruction will result in loss of warranty.
Tools required for assembly of workwalls:
Tape measure
48" to 60" Level
Cordless drill w/ driver & drill bits
Rubber mallet
Wood leveling shims
Laser level
Suggested Fasteners for Workwall Structure connection to the wall:
Toggler® Snaptoggle® or similar high performance anchors — we suggest you use the ¼"– 20 bolt version for added flexibility.
Workwall Installation
September 2012
Step 1
Identify the highest point of the floor along the intended
mounting wall. The highest point can be found by
projecting a laser level on the wall and measuring the
distance from the floor to the line. The smaller dimension is
the highest point of the floor.
Step 2
Mark stud locations on the intended mounting wall.
Additional anchoring to the studs is required
during installation.
a.k.a. workwall installation